Once again, the manual crank arm is used to place each pole body of the circuit breaker in the opening position.<br> Insert the pry bar into the manual crank arm and install it on the transmission shaft of a pole breaker body, and open and close each pole body of the circuit breaker, which should be able to switch on and off smoothly without obvious jamming. After passing the test, put the circuit breaker in the switch-off position.<br> Install the transmission crank arm, pin shaft and manual pry bar provided randomly, and then carry out slow closing operation. Monitor whether the circuit breakers of each pole are connected with a multimeter, measure the corresponding distance when connected and make records for the calculation of the contact stroke of the circuit breakers.<br> Once again, use the manual crank arm to place each pole body of the circuit breaker in the switch-off bottom position, install the transmission crank arm according to the marked position and connect it with the joint of the buffer, rotate the adjusting joint by hand to preload it, then turn it with a wrench for one turn, and finally tighten the nuts at both ends of the adjusting joint to restore the outer rain cover.<br> Install the opening and closing signs correctly.
正在翻译中..