Each time before the electrolyte is loaded into the immersion tank, the parameters of the electrolyte (con, pH, SV, chloride ion, moisture content) should be tested. After the test is OK, the electrolyte can be loaded into the immersion tank for immersion. If there is no product in the immersion tank, the electrolyte should be tested once a shift, and all test parameters should be recorded in the quality assurance system<br>
正在翻译中..