The supplier shall maintain a full list of hazards associated with his Goods.The Hazard Log shall cover the Product Safety scope described in §2.4 of the present PRDThe Supplier shall submit a record of the analyses and verification actions performed to demonstrate an acceptable level of safety has been achieved as regard the Goods/subsystem to be delivered considering its environment.During the design phase, all hazards associated with the subsystem and its integration shall be continuously identified, managed and verified by the Supplier. As a consequence, all safety measures (risk reduction measures) defined from the design stage up to the end of warranty period must be listed and the verification of their setting in subsystem or its support (maintenance operation) must be clearly demonstrated."