Repeat loop – Repeat steps 6.2 and 6.4 on all four units. A total of five (5) loops should be completed on all four (4) units, then after the third loop of 18 hours Temp Cycling /Humidity storage, gently wipe off the saltwater from the units using a clean, soft and dry cloth. Let the units sit at room temperature (outside the chamber) for 1-2 hours to completely dry off. Perform post signaling, full functional testing and reduced parametric testing (all bands, mid channels and nominal voltage level ONLY) on all (4) units.