After the main contract is signed, the U.S. buyer will do 100% Escrow or 100% LC, each shipment SGS inspection after the factory before the start of the release of 5% of the goods to Singapore distribution. After the goods arrived at FOB Ho Chi Minh Port, SGS signed the goods in the second inspection, released 95% of the goods in the batch of the purchase price to the factory.
正在翻译中..