The wells and targets mentioned in the email are based on preliminary geological results (only tectonic maps, no geological models, 2015), combined with dynamic analysis of a preliminary plan. Due to the tight pre-time, the degree of understanding of the block is limited, there is still a lot of work to be done to improve the well position, including the use of which well side drilling, drilling position, target coordinates of the target layer, well trajectory, etc. need to be further demonstrated and optimized. Therefore, the concrete implementation of the well site design also needs to be completed after we have completed the program research work, combined with the site.<br>At present, we are working hard, has completed the tectonic interpretation, formation comparison, logging interpretation and other work, is in the geological structure modeling work, (specific progress can be consulted bi-weekly reports), from the current understanding, and the previous results of the understanding there are still some differences, so that the understanding of the remaining oil there is greater uncertainty, will inevitably affect the later well site deployment work. Therefore, we believe that we still need to wait for the research work to be put in place before carrying out the actual well position deployment demonstration. <br>The work schedule is as follows: 2020.9 Complete geological modeling and reserve calculation.<br> 2020.11 Completion of the design of the oil storage engineering project.<br> 2020.12 Completion of the well level design.
正在翻译中..