400t/d circulating fluidized bed incineration boiler combustion SRF after a period of time, burning boiler coking, ash accumulation, corrosion serious, smoke temperature increased, short operating cycle, indicating that the original incineration boiler structure layout can not meet the SRF long cycle stable incineration requirements, need to be from the feeding system, boiler structure optimization, process equipment and other aspects of a comprehensive optimization and promotion.
正在翻译中..