1.2ObjectiveThe objective of this document is to define the minimum requirement for the design, materials, fabrication, inspection, testing, painting, documentation and preparation for shipment for the supply of the Instrument & Telecom Cablesfor the Floating Production Storage and Offloading facility -Mero 2 FPSO.