二次加密草捆时,将电控箱控制面板手动/自动循环旋钮旋至自动循环位置,横向顶出液压缸、纵向顶出液压缸各自退回至原位、液压主缸退回至右端、成型模的英语翻译

二次加密草捆时,将电控箱控制面板手动/自动循环旋钮旋至自动循环位置,横

二次加密草捆时,将电控箱控制面板手动/自动循环旋钮旋至自动循环位置,横向顶出液压缸、纵向顶出液压缸各自退回至原位、液压主缸退回至右端、成型模门自动打开,此时液压泵卸荷。把一次压捆后的草捆放入左端模腔,按自动控制主缸左移按钮,左端成型模门自动关闭,液压主缸压头快速向左移动压制草捆,随着压力升高主液压缸移动速度减慢,最后达到草捆所需长度,主液压缸停止运动,液压泵卸荷。此时人工对成型模左腔草捆进行捆扎,同时成型模右腔也放入一捆一次压捆后的草捆,成型模左腔草捆捆扎完成后,按自动控制主缸右移按钮,右端成型模门自动关闭,液压主缸压头快速向右移动压制草捆,同时液压主缸左端压头退回,随着压力升高主液压缸移动速度减慢,最后达到草捆所需长度,主液压缸停止运动,大液压泵卸荷。小液压泵继续工作,自动打开左端成型模门,推动成型模左腔横向顶出液压缸把捆扎好的草捆顶出,之后又推动纵向顶出液压缸把草捆纵向顶出,人工取出草捆,纵向顶出液压缸退回原位,横向顶出液压缸也退回原位,小液压泵卸荷,之后模腔再放入一捆一次压捆后的草捆。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
When re-encrypting the bale, turn the manual/automatic circulation knob of the control panel of the electric control box to the automatic circulation position, the horizontal ejection hydraulic cylinder and the vertical ejection hydraulic cylinder are respectively returned to the original position, the hydraulic master cylinder is returned to the right end, and the forming mold The door opens automatically and the hydraulic pump is unloaded at this time. Put the bale after baling once into the left mold cavity, press the button of the automatic control master cylinder to move left, the left molding mold door will automatically close, the hydraulic pressure head of the master cylinder quickly moves to the left to suppress the bale, as the pressure increases, the main hydraulic pressure The moving speed of the cylinder slows down and finally reaches the required length of the bale, the main hydraulic cylinder stops moving, and the hydraulic pump unloads. At this time, the left cavity of the forming mold is manually bundled. At the same time, the right cavity of the forming mold also puts a bundle of bales after one-time baling. After the bundle of the left cavity of the forming mold is completed, press the automatic control master cylinder right shift button, The right side forming mold door closes automatically, the hydraulic main cylinder head quickly moves to the right to suppress the bale, and at the same time the left end of the hydraulic main cylinder retreats. As the pressure increases, the main hydraulic cylinder slows down and finally reaches the required length of the bale. The main hydraulic cylinder stops moving, and the large hydraulic pump is unloaded. The small hydraulic pump continues to work, automatically opens the left forming mold door, pushes the left cavity of the forming mold to push the horizontal ejection hydraulic cylinder to eject the bundled bale, and then pushes the longitudinal ejection hydraulic cylinder to eject the bale longitudinally, and manually remove the grass. The longitudinal ejection hydraulic cylinder returns to the original position, and the horizontal ejection hydraulic cylinder returns to the original position. The small hydraulic pump is unloaded, and then the mold cavity is put into a bale after a bale once again.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Secondary encryption of bales, the control panel manual /automatic cycle knob to the automatic cycle position, horizontal top hydraulic cylinder, vertical top hydraulic cylinder back to the original position, hydraulic master cylinder back to the right end, molding mold door automatically open, at this time the hydraulic pump discharge. Put the bales after a bale into the left end mold cavity, press the automatic control master cylinder left-move button, the left end mold door automatically closes, the hydraulic master cylinder pressure head quickly move to the left to suppress the bales, with the pressure increases the main hydraulic cylinder movement speed slows down, and finally reach the length required for the bale, the main hydraulic cylinder stops movement, the hydraulic pump unloading. At this time, the artificial mold left cavity bales are tied, while the molded right cavity is also placed in a bundle of grass bales after a bale, molded mold left cavity grass bales are bundled after completion, press the automatic control master cylinder right shift button, the right end mold door Automatic shut-off, hydraulic master cylinder head quickly move to the right to suppress the bale, while the hydraulic master cylinder left end pressure head back, with the pressure increases the main hydraulic cylinder movement speed slows down, and finally reached the required length of the bale, the main hydraulic cylinder stop movement, large hydraulic pump discharge. Small hydraulic pump continues to work, automatically open the left end molding mold door, promote the molding mold left cavity horizontal top hydraulic cylinder to tie up the grass bale top, and then push the vertical top hydraulic cylinder to the grass bale vertical top out, manually remove the grass bale, vertical top hydraulic cylinder back to the original position, horizontal top hydraulic cylinder also returned to the original position, small hydraulic pump discharge, and then the mold cavity into a bundle of grass bales.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
When the bale is densified for the second time, turn the manual / automatic circulation knob on the control panel of the electric control box to the automatic circulation position, the horizontal ejection hydraulic cylinder and the longitudinal ejection hydraulic cylinder return to the original position respectively, the hydraulic master cylinder returns to the right end, and the forming mold door opens automatically. At this time, the hydraulic pump is unloaded. Put the baled bales into the left end mold cavity, press the left button of automatic control master cylinder, the left end molding mold door will close automatically, the hydraulic master cylinder pressure head will move quickly to the left to press bales, with the increase of pressure, the movement speed of the main hydraulic cylinder will slow down, and finally reach the required length of bales, the main hydraulic cylinder will stop moving, and the hydraulic pump will unload. At this time, the bales in the left cavity of the forming die are manually strapped, and at the same time, the bales in the right cavity of the forming die are also put into a bundle of bales after one-time baling. After the bales in the left cavity of the forming die are strapped, press the right button of the automatic control master cylinder, the forming die door at the right end is automatically closed, the hydraulic master cylinder pressure head quickly moves to the right to press the bales, and the hydraulic master cylinder pressure head at the left end returns, With the increase of pressure, the moving speed of the main hydraulic cylinder slows down, and finally reaches the required length of the bale, the main hydraulic cylinder stops moving, and the large hydraulic pump unloads. The small hydraulic pump continues to work, automatically opens the door of the left end forming die, pushes the transverse ejection hydraulic cylinder in the left cavity of the forming die to eject the bundled bales, and then pushes the longitudinal ejection hydraulic cylinder to eject the bales longitudinally, manually takes out the bales, the longitudinal ejection hydraulic cylinder returns to its original position, and the transverse ejection hydraulic cylinder also returns to its original position, and the small hydraulic pump unloads, After that, a bale of baled grass is put into the mold cavity.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: