土体分层沉降的安装方法:l、用φ108钻头钻孔,为了使管子顺利地放到底,一般都需比安装深度深一些,它的原则是10米+0.5米,20米+l米,的英语翻译

土体分层沉降的安装方法:l、用φ108钻头钻孔,为了使管子顺利地放到底

土体分层沉降的安装方法:l、用φ108钻头钻孔,为了使管子顺利地放到底,一般都需比安装深度深一些,它的原则是10米+0.5米,20米+l米,以此类推。2、清孔,钻头钻到预定他位置后,不要立即提钻,需把泵接剑清水里向下灌清水,直至泥浆水变成清混水为止,再提钻后安装。3、安装管子的联接采用外接头,一边下管子一边向管子内注入清水(管了浮力太大时)。4、磁环的安装,按设计要求在每节管子上套上磁环和定位环,并用螺丝固定定位环,然后再把管子插入外接头内,拧紧螺钉,这样边接边向下放到设计深度止。5、若磁环的间隔距离不是正2米时,可采取调节管子长短来实现,也可采用管子上套定位环的办法术解决,但要掌握一个原则:磁环向下要有足够的沉降距离,必须满足其设计要求。6、沉降管放到设计要求后,盖上盖子就可以进行回填。回填原料为现场干细土或中粗沙,回填速度千万不能太快,以免堵塞后回填料不去,从而形成空隙,最好时隔一两天后再去检查一下,填料下沉后再填满之后即可,管子周围加上保护措施,方可放心待后测量。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Installation method of layered settlement of soil: <br>1. Drill holes with φ108 drill bit. In order to put the pipe smoothly to the end, it is generally deeper than the installation depth. Its principle is 10 meters + 0.5 meters, 20 meters + 1 meter, And so on. <br>2. After clearing the hole, do not lift the drill immediately after the drill bit reaches the predetermined position. You need to pour the pump down into the clear water until the mud water becomes clear mixed water, then lift the drill and install it. <br>3. The connection of the installation pipe adopts an external joint, injecting clean water into the pipe while dropping the pipe (when the buoyancy of the pipe is too large). <br>4. For the installation of the magnetic ring, put the magnetic ring and the positioning ring on each section of the tube according to the design requirements, and fix the positioning ring with screws, and then insert the tube into the outer joint, tighten the screws, so that the edge is lowered to the design depth stop. <br>5. If the separation distance of the magnetic ring is not positive 2 meters, it can be achieved by adjusting the length of the tube, or it can be solved by using a positioning ring on the tube, but a principle must be mastered: the magnetic ring must have sufficient settlement downward The distance must meet its design requirements. <br>6. After the settling tube is placed to the design requirements, it can be backfilled by closing the lid. The backfill material is dry fine soil or medium coarse sand on site. The backfill speed must not be too fast to avoid backfilling after clogging, thereby forming voids. It is best to check again after an interval of one or two days, and then fill after the filler sinks After full, it is necessary to add protective measures around the tube, so that you can rest assured to measure later.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
How to install soil layering settlement:<br>l, with the drill bit drilling, in order to make the tube smoothly put to the end, generally need to be deeper than the installation depth, its principle is 10 meters plus 0.5 meters, 20 meters, and l meters, and so on.<br>2, clear hole, drill drill to the predetermined position, do not immediately carry the drill, need to pump the sword water down to fill the water, until the mud water into clear water, and then after the drill installation.<br>3, the installation of the pipe connection using an outer connector, one side down the pipe while injecting water into the pipe (when the buoyancy is too large).<br>4, the installation of magnetic rings, according to the design requirements of each tube on the magnetic ring and positioning ring, and screw fixed positioning ring, and then insert the tube into the outer connector, tighten the screw, so that the edge down to the design depth stop.<br>5, if the interval distance of the magnetic ring is not positive 2 meters, can take the adjustment of the length of the tube to achieve, can also be used on the tube set positioning ring method solution, but to master a principle: the magnetic ring down to have enough settling distance, must meet its design requirements.<br>6, the subsidence tube into the design requirements, cover can be backfilled. Backfilling raw materials for the site dry fine soil or medium coarse sand, backfilling speed must not be too fast, so as not to clog back fillers do not go, thus forming a gap, preferably after a day or two to check, fillers sink and then fill can be, the tube around plus protective measures, can rest assured to wait for the measurement.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
Installation method of layered settlement of soil:<br>l. Drilling with φ 108 drill bit, in order to make the pipe smoothly put to the bottom, it generally needs to be deeper than the installation depth, its principle is 10m + 0.5m, 20m + 1m, and so on.<br>2. For hole cleaning, do not lift the drill immediately after the drill bit has reached the predetermined position. Fill the clean water in the clean water of connecting the pump to the sword until the mud water becomes clear mixed water, and then lift the drill and install it.<br>3. The external joint is used for the connection of the installation pipe, and clear water is injected into the pipe when the pipe is lowered (when the pipe has too much buoyancy).<br>4. For the installation of the magnetic ring, the magnetic ring and the locating ring shall be sleeved on each pipe according to the design requirements, and the locating ring shall be fixed with screws, then the pipe shall be inserted into the outer joint, and the screws shall be tightened, so that the joint can be put down to the design depth.<br>5. If the distance between the magnetic rings is not positive 2 meters, it can be realized by adjusting the length of the pipe or by using the positioning ring on the pipe. However, a principle should be mastered: there should be enough settlement distance for the magnetic ring to fall down, which must meet the design requirements.<br>6. After the settlement pipe is placed in the design requirements, the cover can be covered for backfilling. The raw material for backfilling is dry fine soil or medium coarse sand on site. The backfilling speed must not be too fast, so as not to block the backfill, so as to form a gap. It's better to check it after a day or two. After the filler sinks, it can be filled again. After the protective measures are added around the pipe, it can be safely measured later.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: