The increase in cost is mainly due to the increase of tested material points; Previously, the quotation was made through pictures, and some materials were not shown in the pictures, so the previous quotation did not report, and after receiving the samples, the samples were checked, which needed to be tested. The main increase cost is in the total lead and PAHS test items.If you think the cost is high, will you consider cutting down the materials and not arranging the test?
正在翻译中..