This week compared with last week, the number of weekly items did not change as a whole; measures for air leakage of air horn solenoid valve connector have been formulated, and the current status is to be implemented; the measures for the lack of fixation of the air pipe of the transmission manipulator were verified to be qualified, and it was transferred to the supervision period.<br>