4.7.2 Process points: Polyethylene

4.7.2 Process points: Polyethylene foam elastic material should be used for curtain wall blocking material; glue should not be used on rainy days; both sides of the seam should be cleaned before gluing, and volatile cleaning agent should be used. After cleaning, the seam should be opened within 1 hour. The glue is over; expired weather-resistant sealant should not be used; there should be no bubbles and obvious unevenness in the glue joint after the glue is finished; the straight line of the glue joint should refer to the keel installation process; the width of the glue joint should meet the design glue joint width; the glue joint width The deviation should not be greater than 2mm; the thickness of the weather-resistant glue joint should be above 3.5mm. 5. Dry-hanging natural stone curtain wall construction 5.1 Process flow: Preparation for entering the site-preparation for baseline laying off-upper wall installation-rod installation-on-site anti-corrosion treatment-concealed acceptance-stone installation and laying off-stone Installation-cleaning and caulking glue-cleaning and acceptance. 5.2 Baseline detection and positioning 5.2.1 The measurement of the grid axis of the curtain wall should be coordinated with the measurement of the main structure, and the error should be adjusted in time and should not be accumulated. 5.2.2 Draw the baseline, check and confirm. According to the datum line, the elevation level and axis datum of the building are clearly marked on the outer wall of the building, a fixed datum point is established, and the theodolite and level gauge are used to separate several axes and the level elevation line of each floor.
0/5000
源语言: -
目标语言: -
结果 (简体中文) 1: [复制]
复制成功!
4.7.2工艺要点:幕墙堵漏材料应采用聚乙烯泡沫弹性材料。雨天不宜使用胶水;粘合前应清洁接缝两面,并使用挥发性清洁剂。清洁后,应在1小时内打开接缝。胶水结束了;不应使用过期的耐候密封胶;胶水完成后,胶接处不应有气泡和明显的不平整;胶接点的直线应参照龙骨的安装过程;胶接缝的宽度应满足设计胶接缝的宽度;胶缝宽度偏差不应大于2mm;耐候胶接点的厚度应大于3.5mm。<BR>5.干挂天然石材幕墙施工<BR>5.1工艺流程:进入现场的准备工作-底线铺设的准备-上墙安装杆-现场防腐处理-隐藏的验石安装和下脚石安装-清洁和填缝胶清洁和验收。<BR>5.2基准线的检测和定位<BR>5.2.1幕墙的网格轴的测量应与主体结构的测量相协调,并且误差应及时调整且不应累积。<BR>5.2.2绘制基线,检查并确认。根据基准线,在建筑物的外墙上清楚地标记建筑物的高程水平和轴基准,建立固定的基准点,并使用经纬仪和水准仪将多条轴线和水平高程线分开每个楼层。
正在翻译中..
结果 (简体中文) 2:[复制]
复制成功!
4.7.2 工艺点:聚乙烯泡沫弹性材料应用于幕墙阻隔材料:雨天不应使用胶水:接缝两侧应在粘合前进行清洁,并使用挥发性清洁剂。清洁后,接缝应在 1 小时内打开。胶水结束了:不应使用过期的耐候密封剂;胶水完成后,胶接头不应有气泡和明显的不均匀性:胶接接头的直线应指龙骨安装过程:胶接头的宽度应符合设计胶接宽度:胶合接头宽度偏差不应大于2mm:耐候胶水接头的厚度应在3.5mm以上。<BR>5. 干挂天然石幕墙施工<BR>5.1 工艺流程:准备进入现场准备基线铺设上墙安装杆安装现场防腐处理-隐蔽验收石安装和铺设离石安装清洁和烧结胶水清洗和验收。<BR>5.2 基线检测和定位<BR>5.2.1 窗帘墙网格轴的测量应与主结构的测量进行协调,误差应及时调整,不得累积。<BR>5.2.2 绘制基线,检查并确认。根据数据线,建筑物的高程水平和轴图在建筑物的外壁上清晰标记,建立了固定的标点,并使用正统和水平计将几个轴和每个楼层的水平高程线分开。
正在翻译中..
结果 (简体中文) 3:[复制]
复制成功!
4.7.2工艺要点:幕墙封堵材料应采用聚乙烯泡沫弹性材料,雨天不使用胶水,接缝两侧应在胶接前清洗干净,使用挥发性清洗剂。清洗后,接缝应在1小时内打开。胶结束,过期的耐候密封胶不应使用,胶完后胶缝不应有气泡、明显不匀现象;胶缝直线参照龙骨安装工艺,胶缝宽度应符合设计胶缝宽度;胶缝宽度偏差不大于2mm,耐候胶缝厚度应大于3.5mm。<BR>5干挂天然石材幕墙施工<BR>5.1工艺流程:进场准备基线下线安装上墙安装杆现场防腐处理暗验收石安装及放石安装清理填缝胶清理验收。<BR>5.2基线检测和定位<BR>5.2.1幕墙网格轴线的测量应与主体结构的测量相协调,误差应及时调整,不应累积。<BR>5.2.2绘制基线,检查确认。根据基准线,建筑物外墙上清晰标注建筑物标高和轴线基准,建立固定基准点,经纬仪、水准仪分别分隔多个轴线和各楼层标高线。<BR>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.