The load value is obtained by statistical calculation of the load, and the components used in the power supply system are called loads according to the heating conditions<br>(1) The calculated load is also known as the required load or maximum load calculation load is a hypothetical continuous load, the thermal effect and the actual situation of the enterprise in the same unit of time changes in the load produced by the maximum thermal effect equal in the distribution system design, usually can use the maximum average workload of 30 min, as heating conditions to select the distribution transformer and electrical conductor basis, and used to analyze different voltage loss and power loss for convenient engineering calculation, can also be used as a power consumption and non-power compensation calculation basis<br>(2) Peak current is the starting current component of a single or multiple current cycle with a maximum operating load of about 1 s, which is typically used for voltage loss calculation of voltage fluctuations and voltage drops, as well as for the selection of electrical appliances and components. The degree to which the start-up current affects the non-periodic components of the secondary load should also be taken into account when calibration of the transient action element, in order to determine the backup or emergency management power supply,<br>(3) Consider the seasonal load from the economic operating conditions, consider the capacity of the unit and transformer
正在翻译中..