According to the relevant provisions of the Code for Design of Coal Industry Mines, the annual working day for mine design is determined to be 330 days. The working system adopts the "46 system", with four shifts per day, three shifts for production, one shift for preparation and six hours for each shift. Mine net lifting time is 18 hours every day and night.