Reflow furnace a machine using 20 solid state relays a total of 15, a total of 300, wave furnace a machine 6, a total of 5, plus other heating equipment, a total of nearly 400 dosage, February peak equipment preheating heat pipe short circuit, directly lead to 8 damage, no inventory, this is fragile parts, need to be purchased as soon as possible.
正在翻译中..