2.1 Fundamentals<br>The foundation includes furnace foundation, ground track foundation, trolley traction mechanism (gear mechanism) foundation, fan foundation, and other components. The connection between the foundation and the ground is basically in the form of embedded steel plates, and the load-bearing steel of the ground building is directly welded to the embedded steel plates. The ground track is placed on a pre embedded pad, which is adjustable. During installation, the track is placed on the pad, and the pad is adjusted to make the track level. A special pressure wrench is used to press the track tightly, and then the track foundation is grouted twice to completely fix the track pad.<br>The embedded parts for the civil construction of the foundation include track embedded pads and furnace column embedded pads. There are also pre embedded steel plates and pre embedded bolts on the foundation edge of the trolley dragging gear mechanism. The basic template drawings are designed by the supplier, and the purchaser is responsible for converting them into civil construction drawings and undertaking construction.<br>The track adopts a 43kg heavy-duty track. The track inside the furnace body is guaranteed to be a complete piece and splicing is not allowed. The foundation of the gear. Fully considering the space for maintenance and repair. The foundation pit is covered with a steel cover plate.
正在翻译中..