Overall, 5G site deployment faces the following difficulties: space constraints; Rising rents and high costs of site renovations; Approval time-consuming issues (3 to 12 months); The lack of AC power supply capacity and the lack of capacity of the power supply system, high energy consumption also led to increased electricity costs. Minimalist sites are designed to solve site challenges and include three concepts: simplified, efficient, and evolving. ...
正在翻译中..