Before concrete pouring, first check whether there are gaps and holes in the formwork, clear the wood chips and sundries in the formwork, and ensure the formwork gap is tight without mortar leakage. The cleaning opening of the formwork shall be closed after the sundries and water are removed. The formwork shall be watered and wetted before pouring.<br>3.2 when pouring concrete, the "slurry driving method" shall be used at one end. First, the concrete shall be poured layer by layer into a stepped shape. When it reaches the foundation position, it shall be poured together with the concrete of the slab. With the continuous extension of the stepped shape, it shall be continuously pushed forward. The virtual paving thickness of the foundation pouring is slightly greater than the slab thickness. The slab vibrator shall be used to vibrate back and forth in the vertical pouring direction, and the moving signs shall be used to control the concrete slab Thickness. After pouring the floor to the elevation, beat it with a shovel, then scrape it with a long scraper, and plaster the wooden crab to reduce the shrinkage cracks.<br>3.3 the immersion vibrator used for concrete pouring shall be inserted quickly and pulled out slowly, and the insertion points shall be evenly arranged, moved point by point, and carried out in order, without omission, so as to achieve even vibration. The moving distance shall not be more than 1.5 times of the action radius of the vibrator (generally 300-400mm). During layered pouring, the upper layer concrete shall be inserted into the lower layer concrete for more than 50mm to eliminate the joint between the two layers. The moving distance of the plate vibrator shall ensure that the plate of the vibrator covers the edge of the vibrated part.<br>3.4 when laying the conveying pipe, it is necessary to set up the bent or horse stool of temporary facilities. It is not allowed to place the conveying pipe directly on the reinforcement to prevent the displacement and deformation of the reinforcement. During concrete pouring and vibrating, it is not allowed to trample on the reinforcement, move the original position of embedded parts and reserved holes at will, and it is not allowed to vibrate the reinforcement, formwork and embedded parts at will with a vibrator to prevent the reinforcement, formwork deformation and embedded parts falling off.<br>3.5 when pouring concrete, the reinforcement workers and carpenters shall be assigned to observe the reinforcement and formwork, and the reserved holes, embedded parts and joint bars shall be free of displacement, deformation or blockage. If any problem is found, the pouring shall be stopped immediately and the finished work shall be finished before the poured concrete.<br>3.6 after the concrete is poured, it shall be covered within 12 hours and watered for curing. In summer, cover with wet straw bag or plastic film for maintenance; in winter, do a good job in antifreeze and heat preservation to avoid the structure hidden dangers caused by the freezing of concrete at the initial setting.
正在翻译中..