First, lay cables between cabinets, then between terminal boxes, between terminal boxes and mechanism boxes, and between mechanism boxes and mechanism boxes.<br> Then put the control room to the high pressure room, the control room to the outside, and the high pressure room to the outside.<br> After the cables on each layer of support are full, straighten them all out first, and then tie and fix them temporarily. After all cables are laid, tie and fix them again.