1) The bottom form and support of reinforced concrete beams and slabs should not be removed until the concrete meets the requirements of the construction acceptance specification. The overhanging members must be completed after the construction of the main structure and the concrete strength of the concrete itself reaches 100% of the design strength. Demolition, the removal of the beam and slab bottom form support should also consider the impact of construction load.