The temperature at the construction site is higher than 30 degrees C, the temperature of mixing and paving is 30 to 35 degrees C, at the same time, when the relative humidity of air is less than 80%, the construction of concrete pavement should be carried out according to the provisions of the construction of the high temperature season.<br>When the on-site temperature is greater than or equal to 30 degrees C, should avoid the noon high temperature period construction, can choose in the morning, evening or night construction, night construction should have good operating lighting, and ensure construction safety.<br>The mixture should be mixed with sufficient doses of retardants, high temperature retardants, plasticizers or slow coagulation (efficient) water reduction agents, etc.<br>The concrete mix on the dump truck should be covered.<br>We should speed up the convergence of all aspects of construction, as far as possible to compress the stirring, transportation, paving, finishes and other process links spent time.<br>A hood can be used as a sun shield. Shade during periods when the temperature is highest and the sun shines most strongly.<br>When using cover ediconditioning, you should strengthen sprinklers and maintain adequate humidity.<br>The cut should be depending on the increase of concrete strength or according to 250 temperature hours, it is appropriate to cut the seam sewell secate sethes appropriately earlier than the normal temperature construction to prevent the cutting of the plate. In particular, when the cooling range is large at night or rainfall, the seams should be cut early.
正在翻译中..