a. 所有直桩的角度偏差不能大于 ±1;桩位总偏差移不能大于 75mm。b. 钻桩时如发现任何偏差,均需实时矫正。但如果偏差大于容许偏差(的英语翻译

a. 所有直桩的角度偏差不能大于 ±1;桩位总偏差移不能大于 75m

a. 所有直桩的角度偏差不能大于 ±1;桩位总偏差移不能大于 75mm。b. 钻桩时如发现任何偏差,均需实时矫正。但如果偏差大于容许偏差(即大于 1度),而不能实时矫正,则需时停止钻孔工作,并考虑矫正措施;必要时,回填钻孔重新开线钻孔。c. 到达石面及Bottom level都要取石办,通知及入检验表格给 R.E.验收石质及深度。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
a. The angle deviation of all straight piles shall not be greater than ±1; the total deviation of the pile position shall not be greater than 75mm. <br>b. If any deviation is found when drilling the pile, it needs to be corrected in real time. However, if the deviation is greater than the allowable deviation (that is, greater than 1 degree) and cannot be corrected in real time, it is necessary to stop the drilling work and consider corrective measures; if necessary, backfill the drilling and re-open the drilling. <br>c. When reaching the stone surface and Bottom level, the stone office must be collected, and the notification and inspection form shall be submitted to RE to check the stone quality and depth.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
a. The angle deviation of all straight piles shall not be greater than ± 1 ; The total deviation of pile position shall not be greater than 75mm.<br>b. Any deviation found during pile drilling shall be corrected in real time. However, if the deviation is greater than the allowable deviation (i.e. greater than 1 degree) and cannot be corrected in real time, it is necessary to stop drilling and consider corrective measures; If necessary, backfill the drilling hole and reopen the drilling line.<br>c. When reaching the stone surface and bottom level, take the stone office, notify and enter the inspection form to R.E. for acceptance of stone quality and depth.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
A. the angle deviation of all vertical piles shall not be greater than 1; The total deviation of pile position cannot be greater than 75mm.B. Any deviation found during pile drilling shall be corrected in real time. However, if the deviation is greater than the allowable deviation (i.e. greater than 1 degree) and cannot be corrected in real time, it is necessary to stop drilling and consider corrective measures; When necessary, backfill the drilling hole and re-open the drilling hole.C. when you reach the stone surface and Bottom level, you should take the stone, notify and enter the inspection form to R.E. for acceptance of the stone quality and depth.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.