混凝土温控措施。混凝土温控措施能够较大程度上帮助施工人员实现对工程质量的控制,避免施工期间出现裂缝等现象。在采取该项措施施工期间,工程技术人的英语翻译

混凝土温控措施。混凝土温控措施能够较大程度上帮助施工人员实现对工程质量

混凝土温控措施。混凝土温控措施能够较大程度上帮助施工人员实现对工程质量的控制,避免施工期间出现裂缝等现象。在采取该项措施施工期间,工程技术人员应及时对材料配比环节进行细化,合理选择水泥等外掺料,使材料配比能够与大体积混凝土施工要求相符,以此实现混凝土水化热温度的有效控制。与此同时,技术人员应及时强化骨料质量的控制工作,采用相关清洗设备,对骨料的含泥量形成有效控制,保证骨料温度能够具有稳定性,进而促进未来施工工作的有序开展。混凝土初期较易出现温度升高现象,为使其温度能够得到有效的降低,在施工期间,技术人员可将水材料以碎冰代替,使混凝土能与碎冰充分融合,进而实现对混凝土出机降温的目的,同时施工过程中可以内部增高冷却水管进行冷却水循环,以控制混凝土初凝前的水化热。如果重力式方块码头在施工期间长期处于高温低湿环境下,应适当增加检测力度,
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Concrete temperature control measures. Concrete temperature control measures can help construction personnel to control the quality of the project to a large extent, and avoid cracks during construction. During the construction period when this measure is taken, engineers and technicians should refine the material ratio in time, and reasonably choose cement and other external admixtures, so that the material ratio can meet the requirements of mass concrete construction, so as to realize the heat of concrete hydration. Effective control of temperature. At the same time, technicians should strengthen the control of aggregate quality in time, adopt relevant cleaning equipment to effectively control the mud content of the aggregate, ensure the stability of the aggregate temperature, and promote the orderly development of future construction work. . The temperature of concrete is prone to increase in the initial stage. In order to reduce the temperature effectively, during the construction period, technicians can replace the water material with crushed ice, so that the concrete can be fully integrated with the crushed ice, and then the concrete can be removed from the machine. The purpose of cooling, at the same time, during the construction process, the cooling water pipe can be increased internally for cooling water circulation to control the heat of hydration before the initial setting of the concrete. If the gravity block wharf is exposed to high temperature and low humidity for a long time during the construction period, the detection intensity should be appropriately increased.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Concrete temperature control measures. Concrete temperature control measures can help the construction personnel to control the project quality to a great extent and avoid cracks during construction. During the construction of this measure, the engineering and technical personnel shall timely refine the material proportioning link and reasonably select cement and other admixtures, so that the material proportioning can meet the construction requirements of mass concrete, so as to realize the effective control of concrete hydration heat temperature. At the same time, technicians shall timely strengthen the control of aggregate quality and adopt relevant cleaning equipment to effectively control the mud content of aggregate, so as to ensure the stability of aggregate temperature and promote the orderly development of future construction work. The temperature of concrete tends to rise at the initial stage. In order to effectively reduce its temperature, technicians can replace the water material with crushed ice during construction, so that the concrete can be fully integrated with crushed ice, so as to realize the purpose of cooling the concrete out of the machine. At the same time, the internal cooling water pipe can be increased for cooling water circulation during construction, To control the hydration heat of concrete before initial setting. If the gravity block wharf is in the environment of high temperature and low humidity for a long time during construction, the detection intensity shall be appropriately increased,
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
Temperature control measures of concrete. Concrete temperature control measures can help constructors to control the engineering quality to a great extent, and avoid cracks and other phenomena during construction. During the construction period when this measure is taken, engineers and technicians should refine the material proportioning link in time, and reasonably select external admixtures such as cement, so that the material proportioning can meet the construction requirements of mass concrete, so as to effectively control the hydration heat temperature of concrete. At the same time, technicians should strengthen the control of aggregate quality in time, adopt relevant cleaning equipment, effectively control the silt content of aggregate, ensure the stability of aggregate temperature, and then promote the orderly development of future construction work. At the initial stage of concrete, it is easy for the temperature to rise. In order to effectively reduce its temperature, during the construction period, technicians can replace the water material with crushed ice, so that the concrete can be fully integrated with the crushed ice, and then the purpose of cooling the concrete out of the machine can be realized. At the same time, during the construction process, the cooling water pipe can be internally increased for cooling water circulation to control the hydration heat of concrete before initial setting. If the gravity square wharf is in the environment of high temperature and low humidity for a long time during the construction period, the detection intensity should be appropriately increased.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: