7.0 SCOPE OF WORKS7.1 General ScopeThe scope of your work will encompass comprehensive Wall Cladding and BMU / Gondola systemConsulting Services.1. The project contain the following stages:a. Schematic Design (Fang An) Stageb. Design Development (Extended Preliminary Design) Stage c. Tender and Construction Documentation Staged. Construction Administration Stagee. Defects Liability Period (24-months)2. All Apartment Tower, Podium Shopping Mall Wall Types including but not limited to:a. tapered areasb. typical and atypical tower wall