When the heat shrink belt completely shrinks, then the entire heat shrink belt heating 5-8 minutes or so, affected by the winter temperature, should properly grasp the heating time, so that the hot melt fully melt and overflow from both ends, in the heat shrink belt surface is still soft, while the hot roller pressure, squeeze out bubbles. The heating flame must cover the edge of the heat shrink belt to ensure that when the heat shrink belt shrinks, there will be no edge- and curling phenomena.<br>After the total contraction of the heat shrink belt, the first weekly, then along the axial (heat shrink belt width direction) from the bottom to the bottom, from top to bottom continuously evenly heated back and forth, heating time 5-8 minutes, so that the inner hot melt fully melted, so that the temperature of the entire filling area is maintained above 130 degrees C, the torch should move continuously, do not jump and appropriately exceed the edge of the shrinking heat belt.<br>Tempering 5-8 minutes is to ensure a complete bonding, overcome the environmental changes brought about by a series of effects, so that the quality of the filling is guaranteed.<br>Avoid shrinkage to complete the immediate heating, hot melt with the increase of tempering time, temperature increase and become soft, sticky, flow, then the adhesive surface and wet state of the combination of the surface has bonding conditions.
正在翻译中..