当热收缩带完全收缩后,再将整个热收缩带加热5-8分钟左右,受冬季气温影响,应适当掌握加热时间,使热熔胶充分熔融并从两端溢出,在热收缩带表面尚的英语翻译

当热收缩带完全收缩后,再将整个热收缩带加热5-8分钟左右,受冬季气温影

当热收缩带完全收缩后,再将整个热收缩带加热5-8分钟左右,受冬季气温影响,应适当掌握加热时间,使热熔胶充分熔融并从两端溢出,在热收缩带表面尚柔软时,趁热辊压,挤出气泡。加热火焰一定要覆盖热收缩带的边缘,以确保热收缩带收缩完成后,不会发生翘边、卷边现象。热收缩带完全收缩后,先周向,后沿轴向(热收缩带宽度方向)从下至上、从上至下不断均匀来回加热,加热时间5-8分钟,使内层热熔胶充分融化,使整个补口部位的温度保持在130℃以上,火把移动应连续,不要跳跃并适当超过热收缩带的边缘。回火5-8分钟是保证一次完成粘接,克服环境变化所带来一系列影响,使补口质量得到保证。切忌收缩完成马上收火,热熔胶随着回火时间的增长、温度的提高而变软、发粘、流动,这时胶面才能与湿润状态的底漆的结合面具有粘接条件。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
When the heat shrinkable tape is fully contracted, heat the entire heat shrinkable tape for about 5-8 minutes. Affected by the temperature in winter, the heating time should be properly controlled to make the hot melt adhesive fully melt and overflow from both ends. The surface of the heat shrinkable tape is still When it is soft, roll it while it is hot to squeeze out bubbles. The heating flame must cover the edge of the heat shrinkable tape to ensure that the heat shrinkable tape will not be curled or curled after the shrinkage is completed. <br>After the heat shrinkable tape is fully shrunk, firstly in the circumferential direction, and then along the axial direction (the width direction of the heat shrinkable tape), heat it back and forth uniformly from bottom to top, from top to bottom. The heating time is 5-8 minutes to fully melt the inner layer of hot melt adhesive. , Keep the temperature of the whole patching part above 130℃, the movement of the torch should be continuous, do not jump and appropriately exceed the edge of the heat shrinkable belt. <br>Tempering for 5-8 minutes is to ensure that the bonding is completed at one time, overcome a series of impacts caused by environmental changes, and ensure the quality of the patch. <br>Do not close the fire immediately after the shrinkage is completed. The hot melt adhesive becomes soft, sticky, and fluid with the increase of tempering time and temperature. Only then can the glue surface and the bonding surface of the wet primer have bonding conditions.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
When the heat shrink belt completely shrinks, then the entire heat shrink belt heating 5-8 minutes or so, affected by the winter temperature, should properly grasp the heating time, so that the hot melt fully melt and overflow from both ends, in the heat shrink belt surface is still soft, while the hot roller pressure, squeeze out bubbles. The heating flame must cover the edge of the heat shrink belt to ensure that when the heat shrink belt shrinks, there will be no edge- and curling phenomena.<br>After the total contraction of the heat shrink belt, the first weekly, then along the axial (heat shrink belt width direction) from the bottom to the bottom, from top to bottom continuously evenly heated back and forth, heating time 5-8 minutes, so that the inner hot melt fully melted, so that the temperature of the entire filling area is maintained above 130 degrees C, the torch should move continuously, do not jump and appropriately exceed the edge of the shrinking heat belt.<br>Tempering 5-8 minutes is to ensure a complete bonding, overcome the environmental changes brought about by a series of effects, so that the quality of the filling is guaranteed.<br>Avoid shrinkage to complete the immediate heating, hot melt with the increase of tempering time, temperature increase and become soft, sticky, flow, then the adhesive surface and wet state of the combination of the surface has bonding conditions.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
After the heat shrinkable belt is fully contracted, heat the whole heat shrinkable belt for about 5-8 minutes. Affected by the temperature in winter, the heating time should be properly controlled to make the hot melt adhesive fully melt and overflow from both ends. When the surface of the heat shrinkable belt is still soft, the bubbles are extruded by hot rolling. The heating flame must cover the edge of the heat shrinkable belt to ensure that the edge warping and curling will not occur after the shrinkage of the heat shrinkable belt is completed.<br>After the heat shrinkable belt is fully contracted, it shall be heated from bottom to top and from top to bottom continuously and evenly back and forth from bottom to top and from top to bottom along the axial direction (width direction of heat shrinkable band) for 5-8 minutes to fully melt the hot melt adhesive in the inner layer, and keep the temperature of the whole joint patching part above 130 ℃. The torch movement should be continuous, do not jump and appropriately exceed the edge of the heat shrinkable belt.<br>Tempering for 5-8 minutes is to ensure one-time bonding, overcome a series of effects caused by environmental changes, and ensure the quality of joint coating.<br>The hot melt adhesive will become soft, sticky and flowing with the increase of tempering time and temperature. At this time, the bonding surface can be bonded with the wet primer.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: