Boiler: 1. Replace/Repair water wall tubes soot blower area as per the的简体中文翻译

Boiler: 1. Replace/Repair water wal

Boiler: 1. Replace/Repair water wall tubes soot blower area as per the recommendation of user around 50% balance 50% conditions status should have been with probable life time. 2. Brum water level indicator elbow connector replaced due to thinness and also scaling observed any analysis done by vendor to know the exact reason for this and how to avoid in near future.3. Platen Super heater Old tubes were replacod due to thinness less then 3.5 mm so how much replaced and balanced tubes thickness how much its not mentioned also is any analysis done for these tubes. 4.Spares parts ordered for this Boiler overhaul whether all recd .for e.g. Desuperheater MOV valves and Actuators qty .08 /02nos .whether they were replaced .5 .ESP First Electric cathode frame ,anode frame inlet current sharing plate /supportsbadly damaged recommended to replace status as of now . 6 .Boiler availability after Overhaul is it 100% now . 7 .Amy abnormality observed after start up and as of now . 8 .what is the frequency for this type of Boiler Overhaul by Vendor . 9 .the report Vendor has not mentioned any Major observations /Recommendationsto be followed in next overhaul so understand all is ok . 10 .Is there is improvement in Boiler performance after this Overhaul .11 .Is all electrical /parts replaced during overhauling working satisfactorily. Turbine : 1 .Generator Fan Blade Rotor retaining ring PT /UTtest performed are reports available with . 3 .Crack was found on the Shroud steam side no .10118 blades and it was not repaired so what is the update . 4 .Bentley Nevada Vibration Instruments are all working . 5 .Is Speed Governing system is functioning satisfactorily . 7.During this Major Overhauling is any observation /recommendations report submitted by vendor. 8 .Turbine availability now 100% , 9 .Is all controls /are checked during startup and working normal as per the design . 10 .All spare parts were well recd . 11.Any NCR List is there any service support issue.
0/5000
源语言: -
目标语言: -
结果 (简体中文) 1: [复制]
复制成功!
锅炉:<br><br>1.根据用户的建议,更换/修理水冷壁管吹灰器的面积约为50%的平衡状态,应保证50%的使用寿命。<br><br>2.由于细度和结垢原因,更换了鼓动水位指示器弯头连接器,并且观察到供应商进行的任何分析,以了解其确切原因以及如何在不久的将来避免使用。<br><br>3.压板式过热器更换旧管是因为其厚度小于3.5毫米,因此对这些管进行了任何分析,因此更换了多少管并且平衡管的厚度没有提到。<br><br>4.为该锅炉大修订购的备件是否全部退役,例如减温器MOV阀和执行器数量为.08 / 02nos。是否已更换。<br><br>5. ESP First Electric阴极框架,阳极框架入口均流板/支撑严重损坏,建议立即更换状态。<br><br>6.大修后的锅炉利用率现在是100%。<br><br>7。发现启动后和到目前为止的Amy异常。<br><br>8。供应商进行此类锅炉大修的频率是多少?<br><br>9。报告供应商没有提到任何重大观察/建议,在下次检修中都应遵循,因此可以理解。<br><br>10.检修后锅炉性能是否有所提高?<br><br>11。在大修工作期间是否已妥善更换所有电气部件。<br><br><br>涡轮:<br><br>1.发电机风扇叶片转子固定环PT / UTtest带有报告。<br><br>3。在裹尸布蒸汽面.10118号叶片上发现裂纹,尚未修理,因此更新了什么。<br><br>4 .Bentley Nevada振动仪器都在工作。<br><br>5.调速系统是否运行正常。<br><br>7.在此大修期间,卖方将提交任何观察/建议报告。<br><br>8。现在涡轮机可用性为100%,<br><br>9。是否按照设计在启动和正常工作期间检查所有控件。<br><br>10.所有备件都妥善存放。<br><br>11.任何NCR列表都没有任何服务支持问题。
正在翻译中..
结果 (简体中文) 2:[复制]
复制成功!
锅炉:<br><br>1. 更换/修复水壁管烟灰鼓风机面积,根据用户的建议约50%平衡50%的条件状态应与可能的生命时间。<br><br>2. 由于薄度和缩放,由于薄度而更换了布鲁姆水位指示器弯头连接器,观察到供应商所做的任何分析,以了解其确切原因以及如何在不久的将来避免。<br><br>3. 板超级加热器旧管被替换由于薄小于3.5毫米,所以多少更换和平衡管厚度多少,它没有提到也是任何分析做这些管。<br><br>4.为本次锅炉大修订购的备件是否全部重新更换,例如除过热器MOV阀和执行器qty.08/02nos.是否更换。<br><br>5 .ESP第一电动阴极框架,阳极框架入口电流共享板/支架严重损坏建议更换状态,到目前为止。<br><br>6 .大修后锅炉的可用性是它100%现在。<br><br>7 .艾米在启动后观察到异常,到现在。<br><br>8.供应商这种类型的锅炉大修的频率是什么?<br><br>9.报告供应商没有提到任何重大意见/建议,在下次大修时应遵循,所以了解一切正常。<br><br>10 .这次大修后锅炉性能是否有提高。<br><br>11 .在大修过程中更换的所有电气/部件是否令人满意。<br><br>涡轮:<br><br>1 .发电机风扇叶片转子固定环 PT /UTtest 执行的报告可用。<br><br>3 .裂纹被发现在罩蒸汽侧没有.10118刀片,它未修复,所以什么是更新。<br><br>4 .宾利内华达振动仪器都在工作。<br><br>5 .速度控制系统是否运行令人满意。<br><br>7.在此大修期间,供应商提交的任何观察/建议报告。<br><br>8 .涡轮可用性现在100%,<br><br>9 .是否根据设计检查所有控件/在启动期间和工作正常。<br><br>10 .所有备件都已收回。<br><br>11.任何 NCR 列表是否有任何服务支持问题。
正在翻译中..
结果 (简体中文) 3:[复制]
复制成功!
锅炉:<br>1根据用户的建议更换/维修水冷壁管吹灰器区域50%左右的平衡50%的状态应具有可能的使用寿命。<br>2Brum水位计弯头接头因变薄而被更换,同时观察到供应商所做的任何分析,以了解发生这种情况的确切原因以及在不久的将来如何避免。<br>三。由于厚度小于3.5 mm,台板式过热器旧管被更换,因此更换了多少管,平衡管的厚度有多大,也没有对这些管进行任何分析。<br>4.为本次锅炉大修订购的备件,如减温器MOV阀和执行器,数量为08/02个,是否已更换。<br>5.ESP第一个电阴极框架、阳极框架入口均流板/支架严重损坏,建议更换,目前状态。<br>6.大修后锅炉可用率为100%。<br>7.启动后至今观察到Amy异常。<br>8.供应商对此类锅炉进行大修的频率是多少。<br>9.报告供应商未提及在下一次大修中应遵循的任何主要观察结果/建议,因此了解一切都是可以的。<br>10.大修后锅炉性能是否有改善。<br>11.大修期间更换的所有电气/部件是否正常工作。<br>涡轮机:<br>1.发电机风机叶片转子扣环PT/UT测试报告可用。<br>3.10118号围带蒸汽侧发现裂纹,未修复,更新情况如何。<br>4.宾利内华达振动仪器都在工作。<br>5.调速系统运行良好。<br>7.在这次大修期间,供应商提交了任何观察/建议报告。<br>8.涡轮机现在100%可用,<br>9.所有控制装置是否在启动期间检查,是否按照设计正常工作。<br>10.所有备件记录良好。<br>11.任何NCR列表是否存在任何服务支持问题。
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: