Please find our comments as follows: Please provide the check form to check the installation of lighting on site before connection;After all the installation is checked, the connection of the new lighting to our existing system is only allowed with our Lock Out/Tag Out approval;Please provide the Test & Commissioning form for lux measurement and circuit test. After it is confirmed you have provide the above required information, the we can schedule a date for the connection. Best regards,