3.3.1 Determination of the number of main transformer stations<br>Requirements for determining the number of main shifts:<br>(1) For the pivot substation, in the case of the medium and low-voltage side has formed a ring network, the substation should be equipped with two main transformers as appropriate.<br>(2) For a single substation or large-scale special substation isolated in the region, three main transformers may be installed at design time to improve the reliability of power supply.<br>In order to ensure the reliability of power supply, avoid - the main transformer failure or maintenance of the impact of power supply, substations are generally installed two main transformers. When three or more, the reliability of substations has improved, but the wiring network is more complex, and investment increases, while increasing the footprint and power distribution equipment and the complexity of electricity protection, as well as the maintenance and reverse operation and many other complications. Considering that the chance of two main transformers failing at the same time is small. Suitable for the growth of long-term load and expansion, and when - the main transformer failure or overhaul, the other main transformer can bear 70% of the load to ensure the normal power supply of the entire substation. Considering that the substation is an important regional substation, it is closely related to local electricity consumption. Therefore, two main transformers are selected, running side by side and with equal capacity.
正在翻译中..