3.3.1主变压器台数的确定主变台数确定的要求:(1)对枢组变电站,在中、低压侧已构成环网的情况下,变电站以装设两台主变压器为宜。(2)对地的英语翻译

3.3.1主变压器台数的确定主变台数确定的要求:(1)对枢组变电站,在

3.3.1主变压器台数的确定主变台数确定的要求:(1)对枢组变电站,在中、低压侧已构成环网的情况下,变电站以装设两台主变压器为宜。(2)对地区性孤立的一次变电站或大型专用变电站,在设计时可装设三台主变压器,以提高供电可靠性。为了保证供电可靠性,避免-台主变压器故障或检修时影响供电,变电站中一般装设两台主变压器。当装设三台及三台以上时,变电站的可靠性虽然有所提高,但接线网.络较复杂,且投资增大,同时增大了占用面积和配电设备及用电保护的复杂性,以及带来维护和倒闸操作等许多复杂化。考虑到两台主变压器同时发生故障机率较小。适用远期负荷的增长以及扩建,而当-台主变压器故障或者检修时,另-台主变压器可承担70%的负荷保证全变电站的正常供电。考虑到该变电站为一重要地区变电站,与地方用电紧密联系。故选用两台主变压器,并列运行且容量相等。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
3.3.1 Determination of the number of <br>main transformers: Requirements for the determination of the number of main transformers: <br>(1) In the case of pivot group substations, in the case where a ring network has been formed on the middle and low voltage sides, it is appropriate to install two main transformers in the substation. <br>(2) For primary isolated substations or large-scale special substations that are regionally isolated, three main transformers can be installed in the design to improve the reliability of power supply. <br>In order to ensure the reliability of power supply and avoid the failure of one main transformer or the influence of power supply during maintenance, two main transformers are generally installed in the substation. When three or more units are installed, although the reliability of the substation is improved, the wiring network is more complicated and the investment is increased. At the same time, the occupied area and the complexity of power distribution equipment and power protection are increased. , And bring many complications such as maintenance and trip operation. Considering that the probability of two main transformers failing simultaneously is small. It is suitable for long-term load growth and expansion, and when one main transformer fails or is overhauled, the other main transformer can bear 70% of the load to ensure the normal power supply of the entire substation. Considering that this substation is an important regional substation, it is closely connected with local power consumption. Therefore, two main transformers are selected for parallel operation and equal capacity.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
3.3.1 Determination of the number of main transformer stations<br>Requirements for determining the number of main shifts:<br>(1) For the pivot substation, in the case of the medium and low-voltage side has formed a ring network, the substation should be equipped with two main transformers as appropriate.<br>(2) For a single substation or large-scale special substation isolated in the region, three main transformers may be installed at design time to improve the reliability of power supply.<br>In order to ensure the reliability of power supply, avoid - the main transformer failure or maintenance of the impact of power supply, substations are generally installed two main transformers. When three or more, the reliability of substations has improved, but the wiring network is more complex, and investment increases, while increasing the footprint and power distribution equipment and the complexity of electricity protection, as well as the maintenance and reverse operation and many other complications. Considering that the chance of two main transformers failing at the same time is small. Suitable for the growth of long-term load and expansion, and when - the main transformer failure or overhaul, the other main transformer can bear 70% of the load to ensure the normal power supply of the entire substation. Considering that the substation is an important regional substation, it is closely related to local electricity consumption. Therefore, two main transformers are selected, running side by side and with equal capacity.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
3.3.1 determination of the number of main transformers<br>Requirements for determining the number of Main Transformers:<br>(1) For the pivot group substation, when the middle and low voltage sides have formed a ring network, it is better to install two main transformers in the substation.<br>(2) For regional isolated primary substation or large special substation, three main transformers can be installed in the design to improve the reliability of power supply.<br>In order to ensure the reliability of power supply and avoid the failure of one main transformer or the influence of maintenance on power supply, two main transformers are generally installed in the substation. When three or more substations are installed, the reliability of the substation is improved, but the connection network and network are more complex, and the investment is increased. At the same time, the occupied area, the complexity of distribution equipment and power protection, as well as the complexity of maintenance and switching operation are increased. Considering that the failure probability of two main transformers at the same time is small. It is applicable to the long-term load growth and expansion. When one main transformer fails or is overhauled, another main transformer can bear 70% of the load to ensure the normal power supply of the whole substation. Considering that the substation is an important regional substation, it is closely connected with local power consumption. Therefore, two main transformers are selected for parallel operation with equal capacity.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.