The basic formwork should be mainly wood formwork. Joints should be strictly jointed at the male and female corners of the nodes to make the connection firm and reliable to ensure that there is no leakage of grout and no mold running when pouring concrete.
The base template should be based on a wooden template. Node Yin and Yang angle should be strict seam, so that its connection is strong and reliable, to ensure that the pouring of concrete does not leak pulp, do not run mold.
The foundation formwork shall be mainly wood formwork. The joints at the internal and external corners of the joint shall be strictly jointed to make the connection firm and reliable, so as to ensure that there is no slurry leakage and no formwork running during concrete pouring.<br>