Now watering the floor template load-bearing frame should be composed of 48×3.5mm fastener-type steel pipe load-bearing frame system, the top plate load-bearing frame at the same time as a column template bracket, the load-bearing frame and rebar engineering at the same time, pole spacing is generally 700 to 900mm, horizontal running direction is not less than three shear levers, the bottom foot connection should be set on both sides of a sweep bar, in order to effectively ensure that the current pouring steel pipe load carrier structure overall motion stiffness, not to occur stress deformation, need to be set between each template between the shear oblique support.