The concrete pouring capacity of the main terminal reaches 105,000 cubic meters, and the average monthly pouring capacity is equivalent to the construction of 25 18-storey tall buildings. Faced with such a large amount of work, there are 8000 people working here at the same time during the peak period of construction.<br>
正在翻译中..