The parts are the first parts. In the technical review and order review of the first part quotation, Zhongnan incorrectly identified the materials required by the drawings and orders, and used SCF-19 MAX instead of P750 materials as required. At the same time, the inspection bubble diagram compiled by technicians did not set the material requirements on the drawing as a inspection point, so the subsequent inspectors and librarians failed to check the misuse of materials, leading to escape.
正在翻译中..