The site because of the large thickness of soft soil layer, and fill edges, backfill soil is thicker, the warehouse use load is larger, The result ingressload is large, if the site soil is not grounded, in the process of use, the ground sink and due to the use of the load uneven will also lead to the final settlement and differential subsidence is larger, it is recommended that the foundation soil into the foundation treatment, the main purpose of the foundation treatment to solve the filling soil, backfilling load and use of load under the ground subsidence and uneven settlement problem, while increasing the surface soil loading capacity.
正在翻译中..