New subsection is introduced after “10.7 Dam Drainage System” as follows: 10.8 Dam Control Building Equipment 10.8.1. General Requirements The supply includes the following components: 1) Cooling and venetilation systems 2) Firefighting equipment including fire detectors, alarms and smoke evacuation. 3) All accessories necessary for the equipment to be complete and ready for operation when installation is finalised. shall be furnished. The Contractor shall furnish all foundation material required to support the equipment i.e. piping etc. 10.8.2 Design requirements and operating condition Dam Control Building shall host control cubicles of Bottom outlet gates, Environmental flow and Dam drainage system in one room. In second room Hydraulic pressure units of bottom outlet gates and in the third room diesel generator shall be located. The Contractor shall be responsible to estimate proper capacity of the cooling units to keep room with control cubicles equal or below 25°. Firefighting system of hydraulic power unit shall be according to NFPA 851(2010) Chapter 7.13. Firefighting system of diesel generator shall be according NFPA 851(2010) Chapter 7.11. Firefighting system for room with local Control cubicles shall be according to NFPA 75(2020). The Contractor shall be responsible to size enough capacity of the fire-fighting system including smoke exhaust system. Diesel room shall be design according to the needs for diesel generator proper function. Blockouts for air intake and exhaust outlet shall be coordinated with diesel generator supplier. Cooling and ventilation system in the room with local control cubicales shall be desgined fro the following conditions: (1) Ambient temperature (2) Heat output from number of people, lighting, electrical equipment and machine (3) Noise & Vibration level shall be maintained in the standard (4) Rate of air-change / hour shall be according to the applicable standard. Ventilation and cooling system shall be design according to ANSI/ASHARE standards. 10.8.3 Inspection and Test Acceptance tests shall include the following: For Cooling and ventilation system: • Tests of the correct functioning of control and protection equipment. • Tests to verify performance of the cooling and ventilation system. For Firefighting system: • Function test of Fire Fighting System • Detector and FAAP functional test and inspection • Portable Fire Extinguishers inspection 10.8.4 Spare Parts and Training The mandatory spare parts shall at least include the following: (1) Any spare parts and consumable as indicated in the О&М manuals and which is necessary to ensure smooth operation until impounding. The Contractor shall provide training to the Owner’s personnel for all disciplines and all components and systems part of his supply.