Each period, the CFE and MAD are updated to reflect current error, and the tracking signal is compared to some predetermined limits. The MAD can be calculated in one of two ways: (1) as the simple average of all absolute errors (as demonstrated in Example 8.1) or (2) as a weighted average determined by the exponential smoothing method: