Consider our build demand/volume/cost, here are our plan/proposal for CR/testing plan, but there have one concern: as HP requirement, CP need do low/high temp./humidity testing, those CP need scrap and would not ship after testing, I think HP would not absorb the scrap cost, and it is not reasonable for Jabil absorbing the cost, so can six pure will take those scrap cost