The purpose of this procedure is to describe how to commission and achieve on-specification production from the Oil Extraction Column (OEC) and the Solvent Caustic Wash Column (SCWC). These columns must be operational to remove and recover phenol from the phenolic waste water produced from the operation of the rest of the plant so that the water can be further treated prior to its discharge from the plant.