2.3.7 Energy interface node diagram (engineering installation diagram). <br>2.3.8 Public energy demand information and energy consumption table. (Including CIP cleaning parameters) <br>2.3.9 Test machine material list. <br>2.3.10 Consumables list. <br>2.3.11 Random spare parts list. <br>2.3.12 Supply schedule. <br>2.3.13 Mechanical and electrical installation standards. <br>2.3.14 Acceptance criteria. <br>2.3.15 After-sales service commitment. <br>2.3.16 Training plan, etc.
正在翻译中..