The 6005A material side roof profile supplier's 5th mold test was still unqualified, and due to the short-term and multiple-frequency mold test, the mold has been cracked and scrapped (the specific mold damage photo is below). <br>Due to the current shutdown of the supplier's mold factory and related heat treatment equipment, new molds cannot be remade before February 14. <br><br>Based on the above situation, the A5.1 version plan can no longer be satisfied. The attachment is the first train development plan estimated based on the current situation, please refer to. <br><br>Sorry for this issue and hope you can understand our difficulties, thank you.
正在翻译中..