Carry out heightening and filling and leveling operations. A wet soil storage yard is set up in this area to turn the wet soil with a large moisture content into the sun;
To carry out high-filling and leveling operations, the area is equipped with wet soil mounds, in order to turn over the wet soil with a large water content;