Please arrange engineers arrived at the scene at December 10, 2019 guiding the rotary furnace and crusher installation, working time is about 15 days. Attached is an invitation.
Please arrange for engineers to arrive on site on December 10, 2019 to guide the installation of rotary furnaces and crushers, working for approximately 15 days. The attachment is an invitation letter.
Please arrange the engineer to arrive at the site on December 10, 2019 to guide the installation of rotary furnace and crusher, with a working time of about 15 days. Attached is an invitation letter.<br>