Come to the production line, first check the production of products indicators, which is essential. Immediately after, the accuracy test of the equipment and the sealing test of the blister plate should be carried out. That's what you have to do in the first half. Next, the whole process of work is to materialize, collect, and dump garbage. Or sometimes batch and batch will be batched.
正在翻译中..