接通电源开关,液晶显示屏立即点亮,出现激光告警界面,表示电源接通。将工况选择开关置“AUTO”,将拟检查档次之烟幕弹击发线连接到检测工装,将的英语翻译

接通电源开关,液晶显示屏立即点亮,出现激光告警界面,表示电源接通。将工

接通电源开关,液晶显示屏立即点亮,出现激光告警界面,表示电源接通。将工况选择开关置“AUTO”,将拟检查档次之烟幕弹击发线连接到检测工装,将工况选择开关置“MANUAL”(由此动作而出现的其它的检查与击发指示灯亮不予理会),选择预发射烟幕弹,按下击发按钮,检测工装指示灯应亮,说明弹已被正常击发出膛,即各击发方式击发控制工况良好。(注意:按下至松开击发按钮的时间间隔不应大于2秒)。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Turn on the power switch, the LCD screen lights up immediately, and a laser warning interface appears, indicating that the power is on. Set the working condition selection switch to "AUTO", connect the smoke bomb firing line of the grade to be checked to the inspection tool, and set the working condition selection switch to "MANUAL" (other inspection and firing indicators caused by this action will be ignored) , Select the pre-fired smoke bomb, press the firing button, the detection tool indicator should be on, indicating that the bomb has been fired normally, that is, the firing control of each firing method is in good condition. (Note: The time interval from pressing to releasing the firing button should not be greater than 2 seconds).
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
On the power switch, the LCD display is lit immediately, and a laser alarm interface appears to indicate that the power is on. Put the operating condition selection switch on "AUTO", the smoke screen shot line to check the grade is connected to the detection work assembly, the working condition selection switch is placed on "MANUAL" (other checks and blow indicators that appear from this action are ignored), select the pre-launched smoke screen bomb, press the blow button, the detection work load indicator should be lit, indicating that the bomb has been normally hit, that is, the blowing mode of blow control work conditions are good. (Note: The interval between pressing and releasing the hit button should not be greater than 2 seconds).
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
Turn on the power switch, the LCD will light up immediately, and the laser alarm interface will appear, indicating that the power is on. Set the working condition selection switch to "auto", connect the firing line of the smoke bomb to be inspected to the inspection tooling, set the working condition selection switch to "manual" (other inspection and firing indicator lights caused by this action will be ignored), select the pre fired smoke bomb, press the firing button, and the inspection tooling indicator light will be on, indicating that the bomb has been normally fired out of the chamber, that is, each firing mode The firing control condition is good. (Note: the time interval between pressing and releasing the firing button should not be more than 2 seconds).<BR>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: