各监测仪器的观测频率如下:(1)真空度监测:真空预压开始后,泵上及膜下真空度每2小时测读一次,发现真空压力有下降现象应立即查找原因并及时进行的英语翻译

各监测仪器的观测频率如下:(1)真空度监测:真空预压开始后,泵上及膜下

各监测仪器的观测频率如下:(1)真空度监测:真空预压开始后,泵上及膜下真空度每2小时测读一次,发现真空压力有下降现象应立即查找原因并及时进行处理。稳定后每天一次。(2)表层沉降观测:沉降标位置在铺膜前后应对应。抽真空前30天每天观 测一次,30~50天内每2天观测一次,50~80天后每4天观测一次,80天后每5天观测一次。如遇特殊情况增加观测频率。(3)孔隙水压力在抽气前观测一次,孔隙水压力在抽气期间每天观测一次。(4)分层沉降观测:同表层沉降观测频率。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
The observation frequency of each monitoring instrument is as follows: <br>(1) Vacuum degree monitoring: after the vacuum preload starts, the vacuum degree on the pump and under the membrane is measured every 2 hours. If the vacuum pressure drops, you should immediately find the cause and deal with it in time. Once a day after stabilization. <br>(2) Observation of surface settlement: The position of the settlement mark should correspond to before and after the film laying. Observe once a day for 30 days before evacuation, every 2 days for 30 to 50 days, every 4 days after 50 to 80 days, and every 5 days after 80 days. Increase the observation frequency in case of special circumstances. <br>(3) The pore water pressure is observed once before pumping, and the pore water pressure is observed once every day during pumping. <br>(4) Layered settlement observation: same as the observation frequency of surface settlement.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
The observation frequencies of the monitoring instruments are as follows:<br>(1) Vacuum monitoring: after the vacuum pre-pressure starts, the vacuum on the pump and under the membrane every 2 hours, found that the vacuum pressure has decreased phenomenon should be immediately found cause and timely treatment. Once a day after stabilization.<br>(2) Surface subsidence observation: the settlement mark position should be addressed before and after the film is laid. 30 days before the vacuum observation once a day, 30 to 50 days every 2 days, 50 to 80 days after every 4 days, 80 days after every 5 days. Increase the frequency of observations in case of special circumstances.<br>(3) Pore water pressure is observed once before pumping, and pore water pressure is observed once a day during pumping.<br>(4) Stratified settlement observation: the observation frequency of the same surface layer subsidence.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
The observation frequency of each monitoring instrument is as follows:<br>(1) Vacuum degree monitoring: after the start of vacuum preloading, the vacuum degree on the pump and under the membrane shall be measured and read every 2 hours. If the vacuum pressure drops, the cause shall be found out immediately and handled in time. Once a day after stabilization.<br>(2) Surface settlement observation: the position of settlement mark shall be corresponding before and after membrane laying. Observe every day 30 days before vacuuming, every 2 days in 30-50 days, every 4 days in 50-80 days and every 5 days in 80 days. In case of special circumstances, increase the observation frequency.<br>(3) Pore water pressure is observed once before pumping, and once a day during pumping.<br>(4) Layered settlement observation: the same as the surface settlement observation frequency.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: