a.根据计划,由PMC计划员开出领料单到仓库领出FPC光板、元件、锡膏、胶水等物品,并做好电子档领用记录,对领出的FPC和元件做好物料台账记的英语翻译

a.根据计划,由PMC计划员开出领料单到仓库领出FPC光板、元件、锡膏

a.根据计划,由PMC计划员开出领料单到仓库领出FPC光板、元件、锡膏、胶水等物品,并做好电子档领用记录,对领出的FPC和元件做好物料台账记录;B.对锡膏和胶水要做好编号和标识卡放入冰箱冷藏,冰箱存储,建立先进先出机制;生产线生产之前锡膏和胶水需要回温4小时,才可以发往产线使用,并做好发放记录。C.根据生产计划每条线提前备好所要生产的产品型号物料,发往产线并做物料登记工作。(建立中间仓专人领料和发放FPC/元件)此工位比较重要暂时一个人员,待后期需要二个班需要二人。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
a. According to the plan, the PMC planner will issue a picking list to the warehouse to pick up the FPC light board, components, solder paste, glue and other items, and make electronic file picking records, and make a material table for the picked FPC and components. Account records; B. Number and identification cards of solder paste and glue should be put in the refrigerator for refrigeration and storage in the refrigerator, and the first-in first-out mechanism should be established; before the production line is produced, the solder paste and glue need to be warmed for 4 hours before they can be sent to the production line Use and make release records. C. According to the production plan, each line prepares the product model materials to be produced in advance, and sends them to the production line for material registration. (Establish personnel in middle warehouse to pick up and distribute FPC/components) This station is more important for one person temporarily, and two people will be needed for the next two classes.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
a. According to the plan, the PMC planner to the warehouse to pick out the collection sheet FPC light plate, components, tin paste, glue and other items, and do a good job of electronic lead records, the fPC and components to do a good job of material ledger records; C. According to the production plan, each line prepares the product model material to be produced in advance, sends it to the production line and does the material registration work. (Establishing intermediate warehouse person nel picking and issuing FPC/component) This station is more important temporary a person, to wait for the later need for two classes need two people.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
a. According to the plan, PMC planner will issue the material requisition to the warehouse to take out FPC light board, components, solder paste, glue and other items, and make electronic file collection record, and make material account record for the FPC and components; B. number and mark the solder paste and glue and put them into the refrigerator for cold storage, refrigerator storage, and establish the first in first out mechanism; solder paste and glue need to be returned before production line It can be sent to the production line for use only when the temperature is 4 hours, and the distribution record shall be made. C. According to the production plan, each line shall prepare the product model materials to be produced in advance, send them to the production line and register the materials. (establish a special person in the middle warehouse to pick up materials and issue FPC / components) this position is very important for the time being. Two people are needed in two shifts later.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: