1. Assembly sequence:place the sweep bars → install the posts one by o的简体中文翻译

1. Assembly sequence:place the swee

1. Assembly sequence:place the sweep bars → install the posts one by one with half the force and fix them with the sweep bars → install the small sweep bars and fix them with the vertical bars and the sweep bars. → Install the crossbar from the first step → Install the second large crossbar → Install the second crossbar from the second step → Add a temporary diagonal brace, the upper end is fixed with the second crossbar from the second step (after removing the wall connection bar)) → Third and four large cross bars and small cross bars → Anlian wall bar → Connect the vertical bar → Add a scissor support → Install a panel2. Pull the knot with the structure in time or use a temporary support to ensure the safety of the assembly process and correct the verticality and the horizontal deviation of the rod with the covering. At the same time, tighten the fastener moderately and the root of the bolt must be placed correctly. When checking with the torque, it must be between 40 and 50 Nm, and the maximum must not exceed 80 Nm to connect the end fittings. at the end of the large crossbar. The opening must be towards the inside of the shelf and the bolts must be upwards to prevent rainwater from entering. 3. The scaffolding must comply with the construction progress and the height of the4. The end of the small crossbar of the two-row frame should be 50 ~ 100mm from the wall, and the ends of each crossing and extending bar should be greater than 100mm to prevent the bar from slipping. 5. The installation of the scissor support must loop one diagonal rod on the vertical post and the other on the extension of the small horizontal post; the distance between the fasteners at the two ends of the diagonal post and the knot of the vertical post does not exceed 200 mm. The connection point between the lowest inclined rod and the vertical rod is not more than 500 mm from the ground.panel: The scaffolding panel of the working layer must be laid with a bamboo fence, which must be covered and the four corners must be tied with 12 # wire on the horizontal post. 4. The scaffolding must be equipped with horizontal and vertical scanning rods, and the vertical scanning rods must use right angle ties and be fixed on the vertical rods no more than 20 cm from the base skid epithelium and horizontal scanning. the rods should be attached to the vertical rods immediately below the longitudinal scanning rod.
0/5000
源语言: -
目标语言: -
结果 (简体中文) 1: [复制]
复制成功!
1.组装顺序:<br>放置扫帚杆→用一半的力一个接一个地安装立柱,并用扫帚杆将其固定→安装小扫帚杆并用垂直杆和扫帚杆固定。→从第一步安装横杆→安装第二个大横杆→从第二步安装第二横杆→添加临时对角撑杆,第二步的第二根横杆固定上端(在卸下墙壁连接杆后) ))→第三和四个大横杠和小横杠→安联墙杠→连接垂直杠→添加剪刀支架→安装面板<br>2.及时拉动带有结构的结,或使用临时支撑以确保组装过程的安全,并校正带有覆盖层的杆的垂直度和水平偏差。同时,适度拧紧紧固件,并且必须正确放置螺栓的根部。用扭矩检查时,它必须在40到50 Nm之间,并且最大不得超过80 Nm以连接端部接头。在大型交叉开关的末端。开口必须朝向架子的内部,并且螺栓必须朝上,以防止雨水进入。<br>3.脚手架必须符合施工进度和高度要求。<br>4.两排框架的小横杆的末端应与墙壁相距50〜100mm,并且每根交叉和延伸杆的末端应大于100mm,以防止横杆滑倒。<br>5.剪刀支架的安装必须使一根对角杆在垂直立柱上成环,另一根在小水平立柱的延长线上成环;对角柱两端的紧固件与垂直柱的结之间的距离不超过200毫米。最低倾斜杆和垂直杆之间的连接点距离地面不超过500 mm。<br>面板:工作层的脚手架面板必须用竹篱笆铺设,必须覆盖竹篱笆,并且四个角必须在水平立柱上用12#钢丝绑扎。<br>4.脚手架必须配备水平和垂直扫描杆,垂直扫描杆必须使用直角扎带,并固定在垂直杆上,且距离基础滑道上皮和水平扫描不超过20 cm。这些棒应在纵向扫描棒下方直接连接到垂直棒。
正在翻译中..
结果 (简体中文) 2:[复制]
复制成功!
1. Assembly sequence:<br>place the sweep bars → install the posts one by one with half the force and fix them with the sweep bars → install the small sweep bars and fix them with the vertical bars and the sweep bars. → Install the crossbar from the first step → Install the second large crossbar → Install the second crossbar from the second step → Add a temporary diagonal brace, the upper end is fixed with the second crossbar from the second step (after removing the wall connection bar)) → Third and four large cross bars and small cross bars → Anlian wall bar → Connect the vertical bar → Add a scissor support → Install a panel<br>2. Pull the knot with the structure in time or use a temporary support to ensure the safety of the assembly process and correct the verticality and the horizontal deviation of the rod with the covering. At the same time, tighten the fastener moderately and the root of the bolt must be placed correctly. When checking with the torque, it must be between 40 and 50 Nm, and the maximum must not exceed 80 Nm to connect the end fittings. at the end of the large crossbar. The opening must be towards the inside of the shelf and the bolts must be upwards to prevent rainwater from entering. <br>3. The scaffolding must comply with the construction progress and the height of the<br>4. The end of the small crossbar of the two-row frame should be 50 ~ 100mm from the wall, and the ends of each crossing and extending bar should be greater than 100mm to prevent the bar from slipping. <br>5. The installation of the scissor support must loop one diagonal rod on the vertical post and the other on the extension of the small horizontal post; the distance between the fasteners at the two ends of the diagonal post and the knot of the vertical post does not exceed 200 mm. The connection point between the lowest inclined rod and the vertical rod is not more than 500 mm from the ground.<br>panel: The scaffolding panel of the working layer must be laid with a bamboo fence, which must be covered and the four corners must be tied with 12 # wire on the horizontal post. <br>4. The scaffolding must be equipped with horizontal and vertical scanning rods, and the vertical scanning rods must use right angle ties and be fixed on the vertical rods no more than 20 cm from the base skid epithelium and horizontal scanning. the rods should be attached to the vertical rods immediately below the longitudinal scanning rod.
正在翻译中..
结果 (简体中文) 3:[复制]
复制成功!
一。装配顺序:<br>放置横杆→用一半的力逐个安装立柱并用横杆固定→安装小横杆并用立杆和横杆固定。从第一步开始安装横杆→安装第二个大横杆→从第二步开始安装第二个横杆→添加临时斜撑,上端从第二步开始与第二横杆固定(拆墙连接杆后)→第三、四大横杆和小横杆→安联墙杆→接立杆→加剪刀撑→安装面板<br>2。及时与结构拉结或采用临时支撑,以保证装配过程的安全,并用覆盖物纠正杆的垂直度和水平偏差。同时,适度拧紧紧固件,螺栓根部必须正确放置。使用扭矩检查时,扭矩必须在40至50牛米之间,连接端部配件的最大扭矩不得超过80牛米。在大横杆的末端。开口必须朝向架子内侧,螺栓必须向上,以防止雨水进入。<br>三。脚手架必须符合施工进度和<br>四。双排架小横杆端部距墙50~100mm,各交叉及延伸杆端部应大于100mm,以防横杆滑落。<br>5个。剪刀撑的安装必须在立杆上绕一根斜杆,在小横杆的延长部分绕一根斜杆,斜杆两端扣件与立杆结的距离不超过200mm。最低斜杆与立杆的连接点距地面不大于500mm。<br>面板:工作层脚手架面板必须铺设竹栅栏,竹栅栏必须覆盖,四角必须用12#铁丝绑在水平柱上。<br>四。脚手架必须配备水平和垂直扫描杆,垂直扫描杆必须使用直角拉杆,并固定在垂直杆上,垂直杆距基础橇上皮和水平扫描不超过20cm。杆应与纵向扫描杆正下方的垂直杆相连。<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: