Winding interruption:<br>1. For the first piece of all orders, whether the coil is beyond the insulating frame shall be taken as the key control item.<br>2. Carry out tension spot check every day. Such as: Tension standard and tension spot check table.<br>3. Strictly perform the visual action after (stator pressing).<br>Noise:<br>1. Improvement of injection mold repair.<br>2. Visual inspection for motor appearance.<br>The enameled wire is burnt out after the motor is locked:<br>1. Add rubber pad on the table to reduce friction.<br>2. Mold opening improvement of insulating frame.<br>Terminal falling off:<br>1. Increase screw torque standard (less than or equal to 2kg)<br>
正在翻译中..