Except for 3m inside the sealing ditch on the north side of the site, no plastic drainage board is required, and SPB-B type boards are required. The total construction is about 683760m. After the site is backfilled to an elevation of + 3.9m and leveling is completed, plastic drainage boards are erected. The plastic drainage board adopts B type board, the board width is 100mm, the thickness is 4.0mm, the square is arranged, the spacing is 1.0m, and the drainage board is 21m long.
正在翻译中..