6.1.1 before unpacking the control cabinet, check whether the package is intact, and carefully remove the impurities and dust on the control cabinet after unpacking.<br>6.1.2 the following inspections shall be carried out before installation. If the requirements are not met, they are not allowed to be used.<br>A whether there is explosion-proof certificate number and explosion-proof mark;<br>B. whether the model and specification meet the requirements of the matched equipment;<br>C whether all the fastening bolts have been tightened, whether the spring washer is lost, and whether the connection between the components of the explosion-proof enclosure is proper.<br>D. whether the operation of the control lever and button lever is flexible.<br>E. for the control cabinet that has been transported for a long time or has not been used for a long time, the insulation resistance value between the electrical parts and the cabinet must be measured before use, and the value should not be less than 1.5m Ω, otherwise, it should be dried.<br>6.2 connection and adjustment<br>6.2.1 wiring must be carried out according to the symbols marked in the control cabinet.<br>6.2.2 the outer diameter of the cable sheath leading into the device sealing ring shall match the aperture of the sealing ring. After tightening the bolts of the connection bucket, the structure shall be sealed, otherwise the flame-proof performance will be lost.<br>6.2.3 during wiring, the cable core shall be placed between two bow shaped washers, and shall be reliably connected to ensure good contact and meet the requirements of electrical clearance.<br>6.2.4 the internal and external grounding bolts shall be reliably grounded.<br>
正在翻译中..